Plastic Waste system

Plastic waste system


Plastic waste system






















The common defects to Plastic waste system

·         Blocking in the pipe

·         High water pressure in they pipes

·         Splits in the pipe

·         They can’t be put in a high pressured area




Materials

·         Plastic waste pipes 32mmx2m £15 (1)

·         Trap £20 (1)

·         Plastic pipe connector 32mm £5 (2)

·         Compression 90Deg Knuckle Bend 32mmn £5 (1)





The defects and limitations of Plastic waste system



·         Different type of sizes

·         Not flexible

·         Bent out of shape



Tools

·         Buckets

·         Wrench

·         Dust sheets

·         Screw driver (flathead)

·         Hack saw




PPE

·         Boots

·         Gloves

·         Goggles



Risk assessment


·         Wet floors and areas (high risk)

·         End of pipe still sharp(low risk)

·         Trips (medium risk)

 We wear correct PPE. To prevent these risks from happening. To stop use from getting hart or tripping over objects keep a tidy area at all times, remove pipe form walk ways and work areas. We wear gloves or hardhat when working with pipe and overhead pipe work. Lay dust sheets to stop water getting everywhere and also buckets as well.





Method statement

We first got our PPE on. We look around to find the split, leaks and damaged piping, when we spot the area we top water mains and we removed damaged area with a bucket under it. We got rid of the damaged pipe we then took the measurements of the damaged area that was 300 mm and fixed back into place with new joint connectors, we then tested for any leaks and other problems then finished (plus clearance).  


Quote

Dear customer


We have inspected the plastic waste and you had a split in the pipe and trap  was not tight.


We turn  of the water so that no more water can get out the  tap and then put a dust sheet and bucket under the pipe needs coming out to collect the water.


Next we cut a pipe to size of existing length and re attached to the same place.


We then tightened the trap back up.


Then we test to see any leaks and problems then finished and then we packed  (plus clearness).



 Times


6 hours


Cost


They coast of all they materials and labour will cost £370.


   Materials £50

   Labour £20 per hour

   Overhead (petrol,PPE,permit) £200

Total cost £370