Replacement Of Inspection Cover



Monday, 17 September 2012


Replacement of inspection cover


Replacement of inspection cover






















The common Defects of inspection covers

· Inspections covers copulas in on you because of they lasting of they man hole we it is about to lost its duribitly

· Can come loses and fall off
So it shall be knocked off or come lose and be open for any one to full in
· Damage to they top of cover and frame
Making it less strong and easy for it to fall in to


Materials

· Shaper sand £5.00
· Cement £7.00
· Steel manhole cover £40
· Water

Limitations of inspection covers

· Different type, weight and size
Making it more difficult to install and knowing what one is used for

· Covers and frame
They type of frame is made form different metals so they have different lasting ability


· Lasting for they manhole
They time length of they manhole were it has to be replaced



Tools

· Bluster
· Lump hammer
· Dust pan brush
· Bin
· Manhole keys
· Bucket
· Pointing trowel
· Brick trowel
· Level



PPE

· Boots

· Gloves

· Goggles

· Dust mask

Risk assessment

· Mortar mix going in eye

· Manhole cover falling on foot

· Mortar going in to an open wound

We will wear the correct PPE to prevent wear goggles to stop mortar mix getting in eyes and then to wear boots that will stop your feet getting crushed form dropping a heavy manhole and cover any wounds so that it cant get in then we will be working to the (HSE) standers and they health and safety 1974 act.




Method stament
We shall put on our correct PPE on before we start the install inspection cover to be well protected. Will tack they existing man hole cover and get rid of it then we will brush lose mortar and dust so we can start to lay a fresh mix of mortar to install a new man hole cover. Then we start to mix sharp sands and cermente together to create the mortar mix then we apply that to the existing man hole cover brick wall and placed the frame and levelled it. Apply around the frame to give it a strong hold and to give it a nice finish by keeping it all flushed, after we shall clean up and do any last minute touches.

Quote
Dear customer
We have inspected your man hole and it needs a new cover, on the top
We will get rid of the existing cover and get rid of it and replace it with a new one
Then apply mortar mix to existing place of were they frame was and level
Then we will finish the last touches that need to ne done ( plus clearance)
Time
6 hours
Cost
The costs of all materials and job will cost £612 plus VAT


  • Materials £52
  • lader £20 per hr
  • overhead (petrol, PPE,permit) £200
Total cost £612