Underground Drainage
Underground Drainage
Underground Drainage
The
common defects to underground drainage
- Tree Root Ingress In Drainage Systems is one of the most common causes of blockages to domestic systems, disturbed ground such as back filled drainage trenches make easy travelling for roots.
- Blockage in pipe this will stop water flowing making it billed up and making it hard to get over stuff throw
- Damage to underground pipes will cause leaks or pipe moving out of place form the mane line to sewage.
Materials
· Bottle gullies £40 (1)
· Underground drain pipe £40 (3)
· Socket £10 (3)
· Long radius £20 (1)
· Bend £10 (1)
· Underground drain pipe £40 (3)
· Socket £10 (3)
· Long radius £20 (1)
· Bend £10 (1)
The
defects and limitations of underground drainage
· Bricks and mortar insurance
policy.
· Damage that results from Erath
movement.
· Drain defect that can be classed as
accidental damage should be covered.
Tools
· Pencil
· File
· Panel saw
· Hack saw
· Tape
Risk
assessment
· Working in a confined area
· Cutting yourself on fresh cut pipe
· Edges can collapse on you (cave
in)
Support the
edges where you are working to stop any chance of a
collapse,
Use a file
instead of your finger to prevent cutting any body parts open and try not to
have to many people working in a confined area to avoid any accidents. We
will be working to the working at the (HSE) standard and
they health and safety act of 1974.
Method
statement
We
shall put on our correct PPE on before we start the installation of your
underground drainage. Then we will get rid of soil and debris in the area that
we need to work in. To put your drainage system in we started installing a
bottle gullie then we attached the long radius bend and cut drain pipe to size
to be able to install it properly in to they bottle gullie. lead to the mane
sewage pipes after we hide all the pipes
by poring cement in.
Quote
Dear
customer
We
have inspected they area you wanted your underground drainage.
Next
we dug up all soil, debris and put in skip.
We
install the bottle guille and all pipes and any bends, long radius and drain
pipe
Then
we refilled they area up with cement
We
finished the last touches that need to be done. (plus clearance)
Times
2
day 8 hurs
Comments
Post a Comment