Replacement Of Inspection Cover
- Get link
- Other Apps
Monday, 17 September 2012
Replacement of inspection cover
·
Inspections
covers copulas in on you because of they lasting of they man hole we it is about to lost
its duribitly
·
Can
come loses and fall off
So it shall
be knocked off or come lose and be open for any one to full
in
·
Damage
to they top of cover and frame
Making it
less strong and easy for it to fall in to
Materials
·
Shaper
sand £5.00
·
Cement
£7.00
· Steel manhole
cover £40
Limitations of inspection covers
·
Different
type, weight and size
Making it
more difficult to install and knowing what one is used for
·
Covers and frame
They type of
frame is made form different metals so they have different lasting ability
·
Lasting
for they manhole
They time
length of they manhole were it has to be replaced
Tools
·
Bluster
·
Lump
hammer
·
Dust
pan brush
·
Bin
·
Manhole
keys
·
Bucket
·
Pointing
trowel
·
Brick
trowel
·
Level
PPE
·
Boots
·
Gloves
·
Goggles
·
Dust
mask
Risk
assessment
·
Mortar
mix going in eye
·
Manhole
cover falling on foot
·
Mortar
going in to an open wound
We
will wear the correct PPE to prevent wear goggles to stop mortar mix getting in
eyes and then to wear boots that will
stop your feet getting crushed form dropping a heavy manhole and cover any
wounds so that it cant get in then we will be working to the (HSE) standers and
they health and safety 1974
act.
Method stament
We shall put on our correct PPE on before we start the
install inspection cover to be well protected. Will tack they existing man hole
cover and get rid of it then we will brush lose mortar and dust so we can start
to lay a fresh mix of mortar to install a new man hole cover. Then we start to
mix sharp sands and cermente together to create the mortar mix then we apply
that to the existing man hole cover brick wall and placed the frame and levelled
it. Apply around the frame to give it a strong hold and to give it a nice finish
by keeping it all flushed, after we shall clean up and do any last minute
touches.
Quote
Dear customer
We have inspected your man hole and it needs a new cover,
on the top
We will get rid of the existing cover and get rid of it
and replace it with a new one
Then apply mortar mix to existing place of were they
frame was and level
Then we will finish the last touches that need to ne done
( plus clearance)
Time
6 hours
Cost
The costs of all
materials and job will cost £612 plus VAT
- Materials £52
- lader £20 per hr
- overhead (petrol, PPE,permit) £200